I A 1 Reconstructed Dining Room Sconce Corner in Polished Plaster
I A 2 Polished Plaster Groin Vault
I A 3 Wainscoting Mock-up
I A 4 Top Layer Plaster Removal Technique
I A 5 Living Room Plaster Removed
I A 6 Archway-Discovery-Beneath-Plaster
I B 1 Bedroom Entry Before Photo
I B 2 Groin Vault Reconstruction Over Former Bedroom Entry
I B 3 Polished Plaster Finish of Restored Open Doorway with Restored Mosaic Flooring
I C 1 Demolishing a 1950s Renovation that Created a Larger Bathroom and Narrowing the Hallway
I C 2 Bathroom Demo View 2 Take Note of Drop Ceiling in Hallway
I C 3 Restoration to the Original State
I C 4 The Antique Ceiling
I C 5 Rebuilt Hallway
I C 6 Restored, Original Mosaic Floor Found in This Hallway
I D 1 Main Hallway with Groin Vault Ceiling
I D 2 Finsh Plaster, Walls and Ceiling
I D 3 TN-Main Hall with Restored Mosaic Floor
I E 1 Dressing Room Framiong View
I E 10 Vaulted Doorway to Bathroom, Finish Plaster
I E 2 Master Dressing Room Framing
I E 3 Framing View 3 Doorways Designed to Support
I E 4 Durock Installation
I E 5 Plaster Prep
I E 6 Plaster Prep After Corner Bead Installation
I E 7 Installing Plaster 'Stepped' Ceiling
I E 8 Plaster Crown Molding Installation
I E 9 Finish Polished Plaster
I F 1-Guest Bedroom Before
I F 2 Guest Bedroom After
I G 1 Office Before (Plaster Prep)
I G 1 Office Before(Plaster Prep)
I G 2 Office with Polished Plaster Vaulted Entry
I G 3 Office with Custom Radiator Cabinet Built to Match Others Found in House
I H 1 Salon-Radiator-Cabinet-Demo--Window-Tuckponting-Flaws-Allowed-Water-Inside
I H 2 New Radiator Box Pattern After Securing From Water
I H 3 Black Metal Radiator Box, Custom Fabrication
I H 4 Finished Cabinet,with New Sill and Trim to Come
I I 1Salon
I I 2 Successful Wall Removal
I I 3 Opening
I I 4 Back View Of Beam Installation
I I 5 Plaster Prep at Room Transition
I I 6 Polished Plaster Finish Transition
I I 7 Salon Plaster View Through Open Doorway to Dining Room
I J 1 Salon Mosaic Before Photo
I J 2 Salon Mosaic After Photo, Star Detail
I J 3 Stars
I J 4 Dining Room Mosaic Floor Before
I J 5 Dining Room Mosaic After
I J 6 Dining Room Floor, Near Full View
II A 1 TN Built in Bookshelf to Match Cabinetry Found Throughout House
II A 2 Bookshelf View
II B 1 Wall Mounted TV Shelf with Hidden Cable Electrical Outlet
II B 3 Shelf Placed at Proper Height for Viewing TY While Seated Hidden Receptacles are Shown in Back of Box, Which is Inside the Wall Space
II B 4 Designed to Match Home Cabinetry and Hide Cords
II B 5 Compact and Low Profile
II C 1 Motor Driven Painting Slide Concept Sketch
II C 2 Motorized Slide Mechanism Installed, Bracket and Wiring for Flat Panel TV Over Fireplace
II C 3 Motor and Track are Concealed But Accessible Via Drop Down Panels that Finish Flush with Ceiling
II C 4 Finish Installation with Painting in Position to Conceal Flat Panel TV
II C 5 Finish View Showing TV Mounted Behind Painting
II C 6 Open for TV Viewing
II C 7 Motorized Action Controlled Wirelessly Through TV Remote
II D 1 Project Convert 'Bachelor-Pad' Entertainment System into Usable Furniture Piece for Young Family
II D 2 Finish Cabinets to Match Existing Top (1) Open Cabinet for Electronics, with Doors for Games, Toys
II E 1 Project Design and Fabricate a Curtain Rod that Returns to Wall at Both Ends AND Bends in the Middle at the Joints of a Bay Window (Finish-Installation-View)
II F 1 Conversion of Attached, Enclosed Room off Kitchen to and Open Plan with Reclaimed Antique Pine Island in Foreground
II F 2 Closet and Built in Cabinet at Room Transition
II F 3 Converted Family Room with Cedar Beams and Pine Panels to Match Great Room (House was Former Country Club)
II F 4 Daytime View, Furnished
III A 1 Before Upper Section
III A 2 Detail Lower Curved Rail
III A 3 Lower Rail View(Left-Side-Was-Completey-Gone)
III A 4 Sketch to Rebuild Missing Porch Section
III B 1 Some Columns and Other Parts Were Completely Rebuilt. This One Has a New, Cypress Lower Section, While the Top is Repaired with Epoxy and Bondo
III B 2 Carving Out the Rotten Wood
III B 3 Surface Rebuild, Mid Process
III B 4 Before Supporting Columns Were Rotten and Collapsing
III C 1 Finish Porch Rebuild, Originally from 1887
III C 2 Finish Right Corner
III C 3 Finish Left Corner
III C 4 TN Finish View
III D 1 Front Door Before
III D 1 This Sidelite Had Been Infested with Termites, and Was Disintegrating. New Walnut Parts Were Milled to Match the Rest and Rebuilt
III D 2 After Sanding
III D 2 Full View, Rebuilt Sidelite is on Right
III D 3 Finish Product
IV A 1 TN Roof Top Ipe Deck
IV A 2 Ipe Deck View
IV A 3 Ipe Deck View
IV A 4 Ipe Deck View
IV A 5 Ipe Planter Box View
IV A 6 Ipe Deck View
IV A 7 Ipe Benches
IV A 8 Ipe Deck Panel Detail
IV B 1 City Garage Rebuild
IV B 2 Garage and Gangway
IV C 1 Cedar Beam Screen Porch
IV C 2 Screen Porch View
IV C 3 Cedar Porch During Construction
IV C 4 Beam Detail
IV D 1 Back Porch and Mud Room Rebuild
IV D 2 Mud Room Salvaged and On Stilts, all Porch Structure Removed
IV D 3 Replace Rotten Wood in Mud Room Structure Before Removing Deck Stilt Supports Corner
IV D 5 Finish Mud Room, Porch Rebuild
IX B 1 Condo Laundry Closet with Floor Tile Laid wo Pitch Washing Machine Failed, Flooding the Hallway and Laundry Closet in Home Below
IX B 2 Lower Level Laundry Before Since This Floor was Also not Pitched to its Drain, the Water from Upstairs Flooded this Hallway
IX B 3 Before Photo of Ceiling in Laundry Room, Floor Below
IX B 4 Room Gut Progress Photo, Flood Source Floor
IX B 5 Finish Room, Lower Level
IX B 6 Finsh Floor with Proper Floor Pitch to Drain to Prevent Future Flooding
V A 1 Hillside Stairs Before
V A 2 Foundation Dig
V A 3 Tread Installation Top View
V A 4 Tread Installation Front View
V A 5 Hillside Stair Case Drainage
V A 6 Stained Cedar Finish Front View
V A 7 Stairs and Landings Finish Top View
V B 1 Upper Landing Excavation
V B 2 Upper Landing Framing
V B 3 Upper Landing Finish
V C 1 Driveway Staircase Post Setting and Drainage Excavation
V C 2 Sand Dune Drain Set in Pea Gravel
V C 3 Pea Gravel Drainage Floor
V C 4 Driveway Staircase Framing Top View
V C 5 Framing Front View
V C 6 TN Cedar Finish View
V C 7 Driveway Staircase Finish View
V D 1 Lower Landing View
V D 2 Landing to Stairs View
V D 3 Walk-up View
V D 4 Top View Driveway Landing
V E 1 Back Porch
V E 2 Back Porch View
V E 3 Back Porch View
V E 4 Back porch View
VI A 1 TN Modern Bath Design
VI A 2 Modern Bath View
VI A 3 View
VI A 4 Vanity Counter Ledge
VI A 5 Toilet Paper Niche
VI A 6 View
VI B 1 High Ceiling Storage
VI B 2 View
VI C 1 Niche Before Photo
VI C 2 After Photo with Door and Trim to Match House Woodwork
VI D 1 Bathroom Start, Early Demo
VI D 2 New Bathroom Finish, Same View
VI D 3 New Plumbing Installation
VI D 4 New Plumbing, Back View
VI D 5 Finish View
VI D 6 Finish Ceiling Above Toilet
VI D 7 Finish Toilet Install (floor-protected)
VI D 8 Finsh Wash Basin (floor-protected)
VII A 1 Kitchen Before Photo
VII A 2 Installation View
VII A 2 Studio Kitchen View
VII A 3 View with Cutting Board Island Insert
VII A 4 Insert View
VII A 5 Insert Detail
VII B 1 Modern Studio Kitchen
VII C 1 Kitchen Space Before Bench
VII C 2 After Installation, Same View
VII C 3 TN Bench, Full View
VII C 4 Bench, Cabinet Transition
VII D 1 Starting Config
VII D 2 Modify and re-arrange cabinets
VII D 3 New Config with Original Doorway
VII D 4 Breakfast nook start, Doorway Discovery
VII D 5 Restored Breakfast Nook
VII D 6 View showing the new backyard patio access via from Kitchen